Existing Structures

Permit Application

Application Process for Existing Structure

All Building applications begin in the Zoning Department.  Please call (843) 740-2582 if you have any questions.

  • Building application filled with completed information (owner name, owner’s contact information, and contractor’s name, contractor’s information, contractor’s state license, and engineer’s name, engineer information, signed and dated.  Address if applicable)
  • Plot (site)plan that reflects the proposed building, driveways, a/c units, steps, porches, patios, drainage easements and building setbacks (including roof overhangs) along with protected trees 8” dbh or greater is required.
  • Display accurate setbacks on site where the property and house corners are located
  • Provide a tree summary that indicates the total number of trees protected on the site, the total number of trees under the footprint of buildings and driveways, and of the remaining trees, the total number of trees you are proposing to cut.  Please note that the actual tree canopy is required to be shown on the drawing and that inch for inch replacement is required for the removal of grand trees.  Place and “X” mark to indicate tree removal and circle to reflect removal.  *If there are no trees on the site, please advise accordingly.
  • If sidewalks were shown on the final plat at the subject site, please show them on the site plan.
  • Please indicate the building height. Example: Building height 25 ft.
  • Encroachment Permit

*Zoning will forward all information with application to the Building Department for their review.

Paperwork Commercial Examiner in the Building Department will need including the information listed above.  Please call (843) 740-2566 if you have any questions.

  • Application signed and approved by the Zoning Department
  • Engineered Stamp Drawings in compliance with 2012 IBC and all applicable codes. Submit one (1) hard copy (size 24 x 36) and one (1) electronic copy in pdf format on CD.
  • MS4 from Public Works
  • 2009 International Energy Conservation Code information (Comcheck report for building envelope, mechanical, exterior and interior electrical lighting systems).
  • Elevation Drawings and Certificate
  • Detailed scope of work with job cost amount
  • Special inspection statement and schedule including the qualified inspection agency.

*Plans Examiner will contact correct party once the permit is ready.

Inspections

For inspections contact appropriate inspectors located on Building Department Staff Directory.

  • Monday – Friday 8:00 am -9:00 am for the same day inspections
  • Monday – Thursday 3:30 pm – 4:30 pm for the next day inspections

Types of Inspections

  • Footing- Inspected by Building and Zoning Department prior to any concrete pour.
  • Slab- After any plumbing and electrical slab inspections
  • Floor Framing- Prior to sheathing
  • Rough- After sub trades have had their rough inspection
  • Sheathing- After rough inspection and prior to insulation inspection
  • Insulation- After insulation is put in place
  • Final Inspection

Posting of Permit

Work requiring a permit shall not commence until the permit holder or his agents posts the permit card inside a permit box in a conspicuous place on the premise.  The permit shall be protected from weather and located in such position as to permit the Building Official or representative to conveniently make the required entries thereon.  No work can be done until a permit is issued.  The permit cards shall be maintained in position by permit holder until the certificate of Occupancy or Completion is issued by the Building Official.  Inspection(s) will not be done by an inspector if the job site is missing permit drawings and a permit box.

The following are required inspections: If an inspection is not called for whether rough, final, etc. you are subject to lose City or State license.  This includes all new construction, renovations and roof work (must provide a ladder). 

The permit holder must call in his/her own inspections unless an authorization letter has been sent prior to the Building Department from the sub-contractors/ owner giving general contactor the okay to call in their work.

Certificate of Occupancy/ Completion will be issued after:

  • All final inspections are completed.
  • All Re-inspection fees are paid.
  • A list of all sub-contractors is submitted.
  • Landscaping inspection completed by Zoning Department.
  • Fire Inspections Completed by Fire Department
  • Submit report of special inspections completion schedule (7) provided on disc.

Documents Required for Existing Certificate of Completion

Certificate of Completion

  • Final Building/ Zoning Inspection
  • Re inspection Fees ( if builder or sub-contractors acquire any re inspection fees doing the project)

Certificate of Occupancy ( New Construction)

  • Sub- Contractor List
  • Finished Floor Elevation Certificate
  • Gypsum Board Letter
  • Revision Letter
  • Roofing Letter
  • Dorchester County Impact Fee( if applicable)
  • Elevation Certificate ( if property is Located in a Flood Zone)
  • PDF- (drawings /plans)(mandatory for the Building Dept. retention)
  • Truss Drawings (if trusses was used)
  • Final Building/Zoning Inspection
  • All Re Inspection fees  paid (if the builder or the sub -contractors have acquired any re- inspection fees during the project)

 

How engaged are you with your city?

Like us on Facebook

Follow us on Twitter

           

City of North Charleston | Copyright © 2014 | All rights reserved. | Site Map | Connect | Employee Directory

Web Design by BlueKey in Charleston, SC